Elecod 125kW / 261kWh Outdoor C&I BESS Cabinet for an Industrial Park in South Africa-
Elecod 125kW / 261kWh Outdoor C&I BESS Cabinet for an Industrial Park in South Africa
2026-07-02
Country: South Africa Energy Storage Capacity: 125kW / 261kWh Brief Introduction: A PV + Storage hybrid system deployed in a South African industrial park to improve energy reliability under unstable grid conditions. The solution features Elecod's 12...
View More
Substation Peak Shaving: 14 × 215 kW PCS with Customer-Supplied 418 kWh Battery Cabinets (3MW/6MWh)-
Substation Peak Shaving: 14 × 215 kW PCS with Customer-Supplied 418 kWh Battery Cabinets (3MW/6MWh)
2026-06-30
Country: South Asia Energy Storage Capacity: 3.01MW / 5.852MWh Brief Introduction: This project is located at a utility substation in South Asia. It deploys 14 units of Elecod 215 kW PCS, each connected to a customer-supplied 418 kWh battery energy s...
View More
PV+200kW/430kWh battery storage+diesel hybrid microgrid for a fish farming-
PV+200kW/430kWh battery storage+diesel hybrid microgrid for a fish farming
2026-06-16
Country: European island country Energy Storage Capacity: 200kW / 430kWh Brief Introduction: Elecod provides advanced C&I BESS (Commercial & Industrial Battery Energy Storage System) solutions for aquaculture energy storage applications, enabling UP...
View More
125kW/241kWh Solar-Storage-Diesel Hybrid Project for Factory-
125kW/241kWh Solar-Storage-Diesel Hybrid Project for Factory
2026-06-05
Country: Portugal Energy Storage Capacity: 125kW/241kWh Brief Introduction: Facing increasing energy costs and the need for a more reliable power supply, a manufacturing facility in Portugal deployed a 125kW / 241kWh solar-storage-diesel hybrid syste...
View More
500kW/1518kWh C&I PV+BESS Project for Peak-to-Valley Arbitrage-
500kW/1518kWh C&I PV+BESS Project for Peak-to-Valley Arbitrage
2026-06-03
Country: Southern Europe Energy Storage Capacity: 500 kW/1518 kWh Brief Introduction: This 500 kW/1518 kWh outdoor energy storage system was integrated with an existing PV installation in Southern Europe to maximize energy value through peak-to-valle...
View More
Elecod PV+ESS Project for Textile Factory in Myanmar-
Elecod PV+ESS Project for Textile Factory in Myanmar
2026-05-26
Country: Myanmar Energy Storage Capacity: 250kW PCS Brief Introduction: The Myanmar textile factory project is configured with Elecod's 2×125kW PCS, together with the customer's 2×241kWh battery cabinets and 1×250kW DC/DC cabinet. Due to high local e...
View More
Smart Microgrid Project for Industrial Park-
Smart Microgrid Project for Industrial Park
2026-05-22
Country: China Energy Storage Capacity: 500kW PCS Brief Introduction: This microgrid project is located in an industrial park in Jiangsu Province, China. In this project, Elecod provided a 500kW PCS paired with client's storage battery. The project c...
View More
400kW/1044kWh C&I outdoor BESS cabinet solution for peak shaving and backup power-
400kW/1044kWh C&I outdoor BESS cabinet solution for peak shaving and backup power
2026-05-20
Country: Northern Europe Energy Storage Capacity: 400kW/1044kWh Brief Introduction: A commercial office building in Northern Europe deployed a 400 kW / 1044 kWh liquid-cooled C&I outdoor BESS cabinet to reduce peak demand charges and ensure reliable ...
View More
Elecod 600kW PCS for China Energy project-
Elecod 600kW PCS for China Energy project
2026-05-11
Country: China Energy Storage Capacity: 600kW Brief Introduction: This project is an OEM project delivered by Elecod for China Energy, featuring three 200kW Elecod PCS cabinets with a total installed power of 600kW. The system helps improve energy se...
View More
C&I PV-plus-Storage: 100% PV Self-Consumption Project-
C&I PV-plus-Storage: 100% PV Self-Consumption Project
2026-04-21
Country: Somalia Energy Storage Capacity: 125kW/215kWh Brief Introduction: In Somalia, electricity can cost up to $1/kWh, with frequent outages from privately operated grids. For commercial users like hotels, this means high energy costs and unreliab...
View More
Elecod 500kW C&I PCS in a Commercial Complex for Emergency Power Backup-
Elecod 500kW C&I PCS in a Commercial Complex for Emergency Power Backup
2026-04-16
Country: Myanmar Energy Storage Capacity: 500kW/1MWh Brief Introduction: The project uses one Elecod 500kW C&I PCS cabinet, which is made up of four of our 125kW power modules, paired with the customer's 1MWh energy storage battery cabinet, to suppor...
View More
Elecod 2.5MW Power Conversion System (PCS) for Peak Shaving-
Elecod 2.5MW Power Conversion System (PCS) for Peak Shaving
2026-04-08
Country: China Energy Storage Capacity: 2.5MW PCS Brief Introduction: In Shenzhen, a busy manufacturing park just got a powerful upgrade — and it's all about working smarter with energy. Teaming up with a leading battery partner, Elecod delivered a p...